Skip to main content

Listing broker remarks

You won't want to miss this home in the highly desirable Braintree Highlands neighborhood. The home sits on a quiet corner lot with a one car garage and driveway for four vehicles.. This bright and sun filled home has 4 bedrooms, 3.5 bathrooms with three levels of living space with a working fireplace in the main living room. The first floor also has a bedroom and full bathroom; both are handicap accessible. The finished basement offers a large living space and also a soundproof music studio and half bathroom. The sellers have done many upgrades including refinishing the hardwood floors, all carpeting in the house is brand new, interior is freshly painted, master shower is a brand new tile shower, brand new stove and overhead microwave, new vanity in the full bathroom upstairs and much more. The backyard is fenced in with a large deck that leads into an above ground pool.— The Firm

Key details

  • 3,788 sq ft
  • 13,643 lot sq ft
  • 4 beds
  • 3.5 baths
  • 1955 built
  • $302 / sq ft
  • $8,770 2025 taxes
MLS #
7⁠3⁠5⁠2⁠5⁠6⁠0⁠1⁠
Last updated
Address
3 Selwyn Road
Town
Braintree, MA
ZIP
02184

Map

Neighborhood: Braintree

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.