Skip to main content

Listing broker remarks

Tucked away at the end of a quiet dead-end street in one of Braintree’s most convenient locations, this well-maintained 3 bedroom, 1 bath home offers comfort, character, and easy access to everything. Inside, you’ll find hardwood floors throughout and a freshly repainted interior completed in May 2026. The home features central air, a sun-filled layout, and a functional floor plan perfect for everyday living. Major updates include a brand new Rheem hot water heater (2026), newer oil tank (2024), refrigerator (2026), garbage disposal (2026), updated sewer piping (2024), and recent heating system improvements including a new igniter and circulator pump. Conveniently located in one of Braintree’s most desirable commuter locations, this home offers easy access to Route 3, I-93/I-95, the Braintree T-Station, Quincy Adams, and Weymouth Landing Commuter Rail, making travel to Boston, Cape Cod, and surrounding areas a breeze. East Middle School is also less than a half mile away!— Keller Williams Realty

Key details

  • 1,068 sq ft
  • 7,562 lot sq ft
  • 3 beds
  • 1 baths
  • 1956 built
  • $585 / sq ft
  • $5,394 2025 taxes
MLS #
7⁠3⁠5⁠2⁠6⁠1⁠1⁠3⁠
Last updated
Address
27 Cindy Ln
Town
Braintree, MA
ZIP
02184
Deed (Bk/Pg)
18288 / 80

Map

Neighborhood: East Braintree

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.