Skip to main content

Listing broker remarks

Welcome to MODERN BARNDOMINIUM LIVING! Showcasing exceptional craftsmanship and attention to detail throughout! Located in Pickering Estates and set on over 5 Acres with beautiful wrap around porch, Custom crafted Ease-of-Use design for A total step-free environment throughout, thanks to SPB Custom Builder's focus on creating a barrier free residence with inconspicuous ADA features! Construction will be underway soon! This meticulously designed three-bedroom, 2 bathroom single-level home will combine modern farmhouse flair and advanced energy efficiency, offers full unfinished walkout basement space for additional storage and potential for future expansion. This property will set a new standard for contemporary living and perfect for todays multigenerational families. Nature trails connecting this cul-de-sac with neighboring Harris Pond Village and surrounded by miles of trails including Harris Pond make this an exceptional location offering a rare blend of recreation and privacy!— ERA Key Realty Services- Milf

Key details

  • 2,048 sq ft
  • 5.05 acres
  • 3 beds
  • 2 baths
  • 2026 built
  • $463 / sq ft
  • HOA b
MLS #
7⁠3⁠4⁠7⁠7⁠6⁠4⁠6⁠
Last updated
Address
Lot 4 Pickering Lane
Town
Blackstone, MA
ZIP
01504
Deed (Bk/Pg)
6373 / 281

Map

Neighborhood: Blackstone

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.