Skip to main content

Listing broker remarks

MOTIVATED SELLER! Welcome to your Ranch-style home conveniently located across the street from a shopping plaza, Market Basket, CVS, and restaurants. Minutes from Rte 3, 93, 95 (128), and 495. Recent upgrades- water heater (2025), sump pump (2024), 2nd shed (2022), heat pump (2019), attic insulation by Mass Save (2019), glass sliding doors (2018), washer/dryer (2018), and solar panels (2018). Renovations in 2018- polished porcelain stone hallway, conversion 1.5 BA to 2 full BA, ceramic bathroom tiles, and most flooring throughout house. Heating, cooling, and electricity are offset by solar panels/heat pump with some months costing the owner $0! Monthly statement available upon request. Excess solar power sold to National Grid for added income! Price with solar panels $679,000 (negotiable). Please contact agent for showings. Last showing at 7pm with 2hr notice. Please submit offers via PDF.— Greatland Real Estate LLC

Key details

  • 1,989 sq ft
  • 12,001 lot sq ft
  • 4 beds
  • 2 baths
  • 1957 built
  • $326 / sq ft
  • $6,922 2025 taxes
MLS #
7⁠3⁠5⁠3⁠0⁠9⁠1⁠9⁠
Last updated
Address
9 Payson Rd
Town
Billerica, MA
ZIP
01821
Deed (Bk/Pg)
31484 / 25

Map

Neighborhood: Billerica

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.