Skip to main content

Listing broker remarks

Ideally located with easy access to Routes 3, 495, I-95, shopping (including the Burlington Mall), dining, and entertainment, this completely rebuilt (keeping only the original foundation and finished in 2023) beautiful home offers modern style, quality craftsmanship, and a functional layout. The open-concept first floor features a stunning kitchen with quartz countertops, premium finishes, and seamless flow into the dining and living areas. A first-floor bathroom with laundry area adds everyday convenience. The home offers 3 bedrooms and 2 full bathrooms on the second floor, including two bedrooms with walk-in closets. The finished walkout basement provides additional living space and direct access to the fully fenced area with a remote-controlled gate for added privacy and convenience, offering plenty of possibilities. Move-in ready and like new, this home is the perfect combination of comfort, style, modern living and convenience.— Keller Williams Pinnacle Central

Key details

  • 1,778 sq ft
  • 5,001 lot sq ft
  • 3 beds
  • 2.5 baths
  • 1920 built
  • $438 / sq ft
  • $5,799 2025 taxes
MLS #
7⁠3⁠5⁠0⁠5⁠8⁠3⁠6⁠
Last updated
Address
50 Great Elm Road
Town
Billerica, MA
ZIP
01821
Deed (Bk/Pg)
32426 / 233

Map

Neighborhood: Billerica

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.