Skip to main content

Listing broker remarks

Fully renovated 3BR/2BA single-family in Billerica offering modern living from top to bottom. Brand new kitchen featuring all-new cabinetry, quartz countertops, tile flooring, and stainless appliances. Open concept living area flows seamlessly for everyday living and entertaining, beautifully restored hardwood flooring. Master bath with finished shower; second bath with full tub. Upgraded 200A electrical service. Updated plumbing throughout. Bonus finished basement space adds flexible living area — home office, playroom, or guest space — not included in listed square footage. Energy-efficient solar system with battery backup — lease transferable to new owner, offering savings on utility costs. Expansive 13,891 SF lot perfect for outdoor enjoyment including fenced in yard. One-car garage. Nothing to do but move in.— Real Broker MA, LLC

Key details

  • 1,839 sq ft
  • 13,891 lot sq ft
  • 3 beds
  • 2 baths
  • 1955 built
  • $407 / sq ft
  • $6,694 2025 taxes
MLS #
7⁠3⁠5⁠2⁠6⁠4⁠5⁠9⁠
Last updated
Address
34 School House Ln
Town
Billerica, MA
ZIP
01821
Deed (Bk/Pg)
38367 / 129

Map

Neighborhood: Billerica

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.