Skip to main content

Listing broker remarks

Fully renovated single-family home in Bellingham offering 3 bedrooms and 2 full bathrooms with a spacious, modern layout. Stunning updates throughout include a brand new kitchen with stainless steel appliances, large island, and sliding doors leading to a generous backyard. Finished walkout basement adds valuable additional living space. Detached 2-car garage with high ceilings provides excellent workspace potential, plus ample parking in a paved driveway. Recent upgrades include new roof, windows, siding, electrical, HVAC, plumbing, hardwood flooring, tile baths, and Trex decking. Ideally located along Route 126 with easy access to shopping, dining, and everyday conveniences. Close to Forge Park/495 Station for commuter rail access, and near Interstate 495. Minutes to Silver Lake Park and a short drive to Franklin and Woonsocket. Ideal for commuters to Boston and Providence.— Century 21 Limitless

Key details

  • 2,746 sq ft
  • 1.00 acres
  • 3 beds
  • 2 baths
  • 1975 built
  • $227 / sq ft
  • $5,192 2025 taxes
MLS #
7⁠3⁠5⁠2⁠1⁠1⁠3⁠9⁠
Last updated
Address
35 Hartford Ave
Town
Bellingham, MA
ZIP
02019
Deed (Bk/Pg)
28795 / 423

Map

Neighborhood: Bellingham

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.