Skip to main content

Listing broker remarks

RARE OPPORTUNITY! Renovated 4 bed/2 bath, 2 car garage split level with additional 20 x 40 *2 story*, 1600 sq ft ADDITIONAL BUILDING with central heat/AC, electricity, water! Chance to create whatever your lifestyle needs most: Office, workshop, potential in law, tinkering garage, etc. Renovations occurred in 2023 and include: new kitchen, 2 updated full baths, new hot water tank, new 4 bed septic, updated electrical and plumbing. Lots of entertaining space on the first level plus oversize 22x20 family/game room plus 4th bedroom on lower level. Oversized 2 car, attached garage with attic storage. Additional bonus space under which could be a gym, office, or shed. .75 acre large, wooded private backyard. Updated deck plus patio space. Very rarely do you find such a large, separate building with all utilities installed along with a thoughtfully renovated home with its own 2 car garage. The possibilities are endless here!— REMAX Executive Realty

Key details

  • 2,220 sq ft
  • 32,818 lot sq ft
  • 4 beds
  • 2 baths
  • 1965 built
  • $306 / sq ft
  • $7,286 2025 taxes
MLS #
7⁠3⁠5⁠2⁠7⁠0⁠3⁠2⁠
Last updated
Address
218 Blackstone St
Town
Bellingham, MA
ZIP
02019
Deed (Bk/Pg)
41088 / 21

Map

Neighborhood: Bellingham

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.