Skip to main content

Listing broker remarks

Brand new construction offering the perfect blend of modern design and everyday convenience! This beautifully crafted 3-bedroom, 3.5-bath home features an open-concept floor plan designed for today’s lifestyle. The stunning kitchen is appointed with stainless steel appliances, high-end finishes, and seamless flow into the spacious living and dining areas—ideal for both entertaining and comfortable daily living. Each bedroom offers generous space, including a thoughtfully designed layout with multiple full baths for added convenience. Ideally located, this home is perfect for commuters with easy access to both Boston and Providence, while remaining close to shopping, dining, and local amenities. A rare opportunity to enjoy brand new construction in a prime location!— Milestone Realty, Inc.

Key details

  • 1,908 sq ft
  • 26,534 lot sq ft
  • 3 beds
  • 3.5 baths
  • 2025 built
  • $330 / sq ft
  • $1,753 2025 taxes
MLS #
7⁠3⁠4⁠8⁠4⁠4⁠9⁠3⁠
Last updated
Address
567 Park St
Town
Attleboro, MA
ZIP
02703
Deed (Bk/Pg)
28923 / 289

Map

Neighborhood: Attleboro

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.