Skip to main content

Listing broker remarks

Built in 2018, this executive ranch offers modern construction & thoughtful design just minutes to highway access and the commuter rail. With almost 1,800 square feet of living space, the home includes three bedrooms and two full bathrooms, highlighted by a private primary suite. The open living area showcases a vaulted ceiling and fireplace, creating a bright and inviting atmosphere for everyday living and entertaining. The kitchen impresses with a large center island, granite countertops, shaker cabinetry and tile backsplash. The home also offers a two-car garage with ample storage, along with a porch and deck for outdoor enjoyment, all set in a quiet and desirable residential neighborhood. Additional features include town water, sewer, gas & solar.— John Slyman

Key details

  • 1,750 sq ft
  • 19,166 lot sq ft
  • 3 beds
  • 2 baths
  • 2018 built
  • $442 / sq ft
  • $10,385 2026 taxes
MLS #
7⁠3⁠4⁠7⁠3⁠6⁠9⁠8⁠
Last updated
Address
49 Pheasant Hill Road
Town
Attleboro, MA
ZIP
02703
Deed (Bk/Pg)
24447 / 155

Map

Neighborhood: Attleboro

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.