Skip to main content

Listing broker remarks

Stunning new construction offering refined design and modern efficiency. This 4-bedroom, 2.5-bath home features an open-concept layout with hardwood floors, a designer kitchen with quartz countertops, soft-close cabinetry, stainless steel appliances, a spacious peninsula, and pantry.Elegant living and dining areas flow seamlessly to a private patio, perfect for indoor-outdoor entertaining. All baths are beautifully appointed with quartz surfaces and upscale fixtures. The second level offers plush carpeting, a convenient laundry room, and a dedicated office space.Additional highlights include an unfinished basement with expansion potential, two-car integral garage, and pre-wiring for future solar and EV charging.This home is the perfect blend of luxury, comfort, and forward-thinking design.— Cynthia Cabana Realty, Inc.

Key details

  • 2,348 sq ft
  • 16,166 lot sq ft
  • 4 beds
  • 2.5 baths
  • 2026 built
  • $372 / sq ft
MLS #
7⁠3⁠4⁠9⁠8⁠6⁠0⁠7⁠
Last updated
Address
12 Valley Run Dr
Town
Attleboro, MA
ZIP
02703
Deed (Bk/Pg)
22314 / 316

Map

Neighborhood: Attleboro

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.