Skip to main content

Listing broker remarks

Thoughtfully designed, energy-efficient three-bedroom, two-and-a-half-bath new construction townhome blending modern style with everyday functionality. The sun-filled open-concept main level features a spacious kitchen, living, and dining area with sleek countertops, a generous island, white cabinetry, stainless steel appliances, recessed lighting, and hardwood floors throughout. The second floor offers two spacious bedrooms, including one with a private balcony, a full family bathroom, and a dedicated laundry area. The top-floor primary suite is a private retreat with cathedral ceilings, a private balcony, generous closet space, and an ensuite bath featuring a double vanity and walk-in shower. Additional highlights include a finished lower level ideal for a media room, gym, playroom, or home office, a shared yard, and the convenience of a one-car garage. Ideally located on Lewis Avenue, close to Arlington centre's shops, restaurants, parks, and commuter routes.— Gibson Sotheby's International Realty

Open Houses

Key details

  • 2,308 sq ft
  • 7,405 lot sq ft
  • 3 beds
  • 2.5 baths
  • 2026 built
  • $606 / sq ft
  • $999,999 2025 taxes
MLS #
7⁠3⁠5⁠3⁠0⁠0⁠8⁠8⁠
Last updated
Address
50 Lewis Ave
Unit
50
Town
Arlington, MA
ZIP
02474
Deed (Bk/Pg)
60596 / 336

Map

Neighborhood: Arlington

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.