Skip to main content

Listing broker remarks

Brand new construction offering 2,400 square feet of thoughtfully designed living space in this beautiful Cape-style home. Featuring 3 bedrooms and 2.5 bathrooms, this home showcases hardwood oak floors, plastered walls, and high-end finishes. The kitchen is equipped with GE Café appliances, including an induction stove and drawer microwave. Fully tiled showers with glass enclosures add a luxurious touch to the bathrooms. Andersen 400 windows throughout. Enjoy outdoor living with two patio areas surrounded by one-of-a-kind landscaping. Additional highlights include an attached 2-car garage and a full-height basement with the potential to be finished as a bonus room or in-law suite. Conveniently located within walking distance to downtown Amesbury, just 2 minutes from I-95 and 3 minutes from I-495.Open House Saturday 5/30 11:30-1pm & Sunday 5/31 12:00-1:30pm— Gibson Sotheby's International Realty

Key details

  • 2,400 sq ft
  • 5,000 lot sq ft
  • 3 beds
  • 2.5 baths
  • 2026 built
  • $395 / sq ft
  • $9,999 9999 taxes
MLS #
7⁠3⁠5⁠2⁠2⁠0⁠1⁠8⁠
Last updated
Address
6 Monroe Street
Town
Amesbury, MA
ZIP
01913
Deed (Bk/Pg)
30477 / 33

Map

Neighborhood: Amesbury

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.